Where we check quality
Quality at Ok-Go is a sequence of checks tied to each job, from the board we receive to the boxes we load. The table shows each step and what it looks at.
| Step | When it happens | What we look at |
|---|---|---|
| 1. Incoming board inspection | When board is delivered, before it is used | Sheet dimensions, flute, delamination, crushed board, signs of pests |
| 2. In-process checks | On the line, while the job runs | The boxes against the job’s spec; some jobs get hourly checks with a photo log |
| 3. Sample and first-article approval | Before production on new designs, and at the start of a run | Fit and construction on a sample you approve; first boxes off the line checked before the rest runs |
| 4. Final inspection | Before the order ships | Finished boxes, before they are loaded |
| 5. Traceability | Every order | One job number ties the order together, from board to shipment |
What do you inspect when board arrives?
Corrugated board is the raw material for every box we make, so it gets checked first. At receiving we look at:
- Sheet dimensions. A sheet that is short or out of square throws off scores, slots and the finished inside dimensions.
- Flute. The flute has to match what the job calls for. A different flute changes the board’s thickness, its stacking strength and the box’s final size.
- Delamination. Liners that have separated from the fluted medium make a weak box, and the defect often gets worse once the box is loaded.
- Crushed board. Board flattened in transit or storage has lost thickness, and with it some of its strength.
- Pests. Board is checked for insects or other pests before it comes onto the floor. Nobody wants them arriving with their boxes.
What gets checked on the line?
While a job runs, the boxes are checked against that job’s specification. For some jobs we run hourly checks and keep a photo log, so there is a dated visual record of what came off the machine during the run.
How do sample and first-article approval work?
Before we run a new design, you approve a sample. We do structural design in ArtiosCAD and cut samples on our in-house sample table, usually within hours, so you can test the fit with your real product. A sample shows fit and construction, but it is not made on the production equipment. That is why the first boxes off the line on a production run are checked before the rest of the order runs.
You can read more in how design and samples work at Ok-Go and in our guide to how box samples work, and why a sample is not a production run.
What happens at final inspection?
Before an order ships, the finished boxes are inspected. This is the last check before your boxes go on a truck.
How does traceability by job number work?
Every order at Ok-Go runs under a job number. If you ever have a question about a delivery, the job number is how we trace it back through production. Writing our job number on your receiving records makes that trace faster.
What should a buyer or supplier-quality engineer ask us?
If you are qualifying Ok-Go as a box supplier, the questions below get you to the useful answers fast. Most of them start with your spec, so send it with your quote request.
| Ask us | Why it matters |
|---|---|
| What do you check on incoming board? | Problems in the board become problems in the box. Our answer is above. |
| Can I approve a sample before production? | Yes. Testing the fit with your real product catches most surprises before the run. |
| Which jobs get in-process checks with a photo log? | If your part or your own customer needs documented checks, say so at the quote stage. |
| What documents can you provide? | Confirm what you need before you place the order, not after the first delivery. |
| What tolerances do you hold on inside dimensions? | Your spec and our standard tolerance need to agree before you approve the design. |
| How much can an order run over or under? | Corrugated orders can come in slightly over or under the quantity ordered. Agree on the allowance up front. See why box orders run over or under. |
| What does the box maker’s certificate on the box say? | It states the board’s rating. See how to read a box maker’s certificate. |
What to put in your spec
The more of this you send, the more there is to check against:
- Inside dimensions as length × width × depth, with the tolerance you need. Our guide to how to measure a box explains the convention.
- Board grade or test rating, such as an ECT or Mullen value. Not sure which you need? Read ECT vs. Mullen.
- Flute and wall (single-wall or double-wall).
- Print: artwork, number of colors and any color standard.
- Critical features: cutouts, insert fit, partition cell sizes, hand holes.
- Quantity, labeling and pallet requirements, including your allowance for overs and unders.
- Documents you need with the shipment, and how you inspect incoming packaging on your side.
Our guide to requesting a box quote walks through the full list.
What if something is wrong with a delivery?
Call or email us with the job number (or your PO number), a short description of what you found and a few photos. We will trace the order by its job number and get back to you with what we find.