A stocking program moves box storage from your building to the box plant. The plant runs your boxes in efficient quantities, keeps them as finished inventory, and sends them to you as you use them. For a company without warehouse space, it’s often the difference between buying boxes at a sensible price per box and buying small, expensive runs every few weeks.
How does a box stocking program work?
Most programs follow the same cycle, whatever the supplier calls it.
- Agree on the items. Each box gets a part number and a locked spec: style, inside size, board grade, print and bundle count.
- Share your usage. Average monthly use, seasonal peaks, and the most you’d ever need in a week.
- Set the levels. A run size (how many to make at once) and a reorder point (when stock drops to that level, the plant schedules the next run).
- The plant produces and stores. Finished boxes are inspected, palletized, labeled and put away.
- You call releases. A release is one delivery from that stock, either on a fixed schedule (every Tuesday, say) or on demand.
- The plant watches the stock. When inventory reaches the reorder point, it runs again, so the shelf doesn’t empty.
The paperwork behind this is often a blanket order: one purchase order for a total quantity over a period, with releases drawn against it.
Who benefits from a stocking program?
| Fits well | Fits poorly |
|---|---|
| Steady, predictable box use | One-time or project orders |
| Little or no warehouse space | Designs that change every few months |
| Many box sizes, each used regularly | Usage that swings without warning |
| A tight receiving dock or a lean production floor | Boxes needed only once a year |
| Wanting production-run pricing without the storage | Very low total volume |
Jumbo boxes and bulk bins are a strong case: a single pallet of them takes up a lot of floor, so holding a full run at the plant frees real space at your site.
Stocking program, blanket order or bulk buying: what’s the difference?
| Option | Who stores the boxes | How you buy | Best when |
|---|---|---|---|
| Order each run as needed | You, briefly | A new PO each time | Usage is irregular |
| Buy in bulk, store yourself | You | One large PO | You have the space |
| Blanket order with releases | Often the plant, until each release | One PO, many deliveries | Usage is steady and planned |
| Stocking program | The plant | Releases on call; the plant tracks stock | Usage is steady and space is tight |
The line between the last two is blurry, and every supplier draws it differently. What matters is what the agreement says.
What should a stocking agreement spell out?
Before the first run, get these points in writing:
- Items and revisions. The exact spec and revision level of every box held.
- Quantities. Run size, reorder point and the maximum stock the plant will hold for you.
- How releases work. Who can call one, how (phone, email, a schedule), how much notice is needed and the smallest release.
- Delivery. Where releases go, receiving hours and how they ship.
- How long stock is held, and what happens after that.
- Design changes and obsolete stock. Who owns leftover boxes when a design changes or is dropped.
- Billing. Whether boxes are invoiced when produced or when released, and how any storage or handling is charged.
- Reporting. How you see what’s on hand and on order.
Answers vary by supplier and by customer, so don’t assume.
How does Ok-Go run stocking programs?
Ok-Go’s plant in Socorro, Texas has a large converting floor plus warehouse space, which is why we can hold inventory and release it on schedule for customers who don’t have their own warehouse. Boxes go through final inspection before they’re stored, and every job carries a job number, so a pallet released months later can be traced back to the run it came from.
Does storage affect the boxes?
Finished boxes keep well when they’re stored flat, dry and off the floor, and used oldest first. Corrugated board absorbs moisture from humid air and loses strength when it does, so storage conditions matter more than storage time. If your boxes will sit at your site after a release, see how heat and humidity weaken corrugated boxes.