A custom box minimum order quantity (MOQ) is the smallest run a plant will produce for one box design. It exists because the cost of getting a run started barely changes with the number of boxes, so very short runs make each box expensive. Knowing what drives the minimum helps you decide whether to order more, change the design, or ask the plant to hold the boxes for you.
Why do box manufacturers have minimum orders?
A box plant earns its keep while the machines are running boxes. Every new job interrupts that with setup work that costs the same whether you order 300 boxes or 30,000.
| Cost | When it happens | Why it hurts small orders |
|---|---|---|
| Machine setup | Every run | Feed, scores, slots, glue and counters are set for each job |
| Printing plates | Once per design (reused if kept on file) | A plate costs the same for 500 boxes or 50,000 |
| Cutting die | Once per die-cut design (reused if kept on file) | Same: a one-time cost spread over the run |
| Start-up sheets | Every run | The first sheets set print registration and folding and don’t become sellable boxes |
| Board purchase | Every run | Corrugated sheets are bought in set sizes and quantities, so a tiny job can leave unusable trim or leftover sheets |
| Order handling | Every order | Scheduling, inspection, paperwork, bundling and loading |
Printing plates and cutting dies are often called tooling. Because tooling is usually a one-time cost, a reorder of the same box often has a lower effective minimum than the first order. Our article on cutting dies and printing plates explains what each one does.
Is the minimum the same for every kind of box?
No. The style, print and size of the box all change how much setup a run needs.
| Box type | What drives its minimum |
|---|---|
| Plain RSC shipping box, no print | Machine setup only; usually the most flexible |
| Printed RSC | Printing plates, ink and color setup added to the machine setup |
| Die-cut mailer, tray or pizza box | A cutting die plus die-cutter setup; several boxes may come from each sheet |
| Pads and partitions | Pads are simple cuts; partitions need slotting and assembly |
| Jumbo boxes, bulk bins, pallet boxes | Each piece uses a lot of board, and oversized blanks may run on different equipment |
| Full-graphic or laminated retail packaging | Extra steps (printed facing sheets, laminating) each add setup |
How can you order fewer boxes without overpaying?
You have more options than “pay the premium or buy too many.”
- Use a standard style where it protects the product. An RSC needs no cutting die. Our comparison of die-cut boxes and RSCs covers when each one makes sense.
- Cut back the print. One color, or a plain box with a printed label, removes plates and press setup. Full-color print can wait until volumes justify it.
- Share one box size across products. One size with different pads or inserts can replace several low-volume sizes and push the combined quantity past the minimum.
- Order a larger run and take it in pieces. Under a blanket order or a stocking program, the plant makes one efficient run and ships it in smaller deliveries.
- Ask for quantity breaks. A quantity break shows where the price per box levels off. Sometimes a run twice the size costs only a little more in total.
- Keep your tooling on file. If dies and plates are stored, the next order skips that cost.
What is the difference between a minimum order and a minimum release?
A minimum order is the smallest quantity the plant will produce. A minimum release is the smallest delivery it will ship from inventory it already made for you. In a blanket order or stocking program, the production run can be much bigger than any single delivery, so your dock never has to hold the whole run.
Do minimums apply to samples?
No. A sample is a single box cut to check size, fit and design before production. At Ok-Go, samples are cut on our in-house sample table, usually within hours once the design is drawn. A sample tells you the box works; it doesn’t commit you to a production quantity.
What should you ask a supplier about minimums?
- What is the minimum for this exact box (style, size and print)?
- What is the price per box at the minimum and at two higher quantities?
- Is the tooling a separate one-time charge, and is it kept on file for reorders?
- Is the minimum lower on a reorder once tooling exists?
- Can you produce a larger run and hold it, releasing smaller quantities?
- How do over and under quantities work on this order? (See why box orders run over or under.)